AI productivity after the headlines: what I would put in the engineering plan
The most consequential AI engineering news this month is a measurement problem. We have increasingly capable coding systems, credible evidence of acceleration in some environments, and no defensible universal multiplier to put into next year's staffing plan.
My position: expand the use of AI, and fund the work required to find out where it actually improves delivery. A technology can deserve aggressive investment while its business impact still needs careful measurement.
Research checked November 11, 2026. Reported findings are linked below; the operating recommendations and forecasts are our assessment.
What the November evidence actually measures
On November 5, METR published a high-access assessment of AI research and development at Anthropic. Its judgment was that capability improvement on well-specified tasks was happening at roughly twice the earlier rate, with substantial uncertainty. METR considered AI-assisted R&D a likely major contributor. It also disclosed that Anthropic had redacted much of the evidence most informative to its conclusions. The public therefore cannot independently examine the full basis of the assessment. Read METR's report and limitations.
That is important evidence about a particular research organization. It is a weak foundation for announcing that an unrelated engineering department can deliver twice its roadmap with the same people. Model capability progress, task completion time, release frequency and customer value are different quantities. A result about one does not supply a conversion rate for the others.
The older evidence deserves the same discipline. In February, METR explained that its follow-up developer productivity experiment had become difficult to interpret: people who benefited from AI increasingly declined work without it, task selection changed, and concurrent agent use complicated time measurement. The researchers believed newer tools were probably helping more, while calling the data weak evidence for the size of that improvement. That update supports neither freezing the original slowdown finding forever nor declaring a clean reversal with a universal speedup. Read the experiment update.
The question for a CTO is which part of the delivery system has improved, for which work, at what total cost.
Follow the work after the code is written
Anthropic's October 13 source-control article supplies a useful operational example. The company reported a sharp rise in merged changes, pressure on source control and CI, and a migration to its own system, Scion. It explicitly described its workload as unusual. This is a company account of an infrastructure response, rather than an independent estimate of general developer productivity. Read the source-control engineering article.
My reading is that removing an implementation bottleneck makes the next bottleneck visible. Most teams should investigate their review queues and build feedback before contemplating a new version-control system.
Consider a hypothetical team using agents to prepare several changes simultaneously. Authors finish earlier, but reviewers receive larger diffs and more decisions. Test environments remain scarce. Product clarification still arrives once a week. The team produces more work in progress while customers see little change.
Adding more generating capacity to that system can make the queue worse. The appropriate next investment might be smaller changes, an isolated test environment for each branch, clearer ownership, or a faster way to settle product questions. It depends on the observed delay.
DORA's March analysis offers supporting context: engineers described verification work consuming some of the time saved in creation, and its broader research associated AI adoption with both higher delivery throughput and greater instability. The qualitative analysis used survey responses, and the association is not proof that AI caused either outcome. Read DORA's analysis and methodology.
A measurement plan I would approve
I would start with a few recurring workflows, each with a clear definition of completion. A dependency update, an unfamiliar bug investigation and a new feature have different demands. Combining them into one productivity number hides the information needed to improve them.
For each workflow, I would record:
- Elapsed delivery time: from an accepted task to a usable release, including time waiting for decisions and review.
- Human effort: implementation, supervision, review, verification and repair. Time spent correcting the tool belongs in the total.
- Accepted outcomes: whether the change met its requirements and remained acceptable after release.
- Operational consequences: regressions, rollback work, support burden and any additional infrastructure cost.
Model usage and suggestion acceptance can explain behavior, but neither is a business outcome. A reduction in typing is valuable only insofar as it frees capacity for something useful or improves the experience of doing the job.
The comparison also needs an honest account of selection. If engineers send easy tasks to agents and retain difficult work themselves, the resulting groups cannot establish a causal speedup. Where practical, use a staggered rollout or randomized assignment among comparable tasks. Where that is impractical, describe the result as observational, record the changes in task mix, and resist precise causal claims.
I would publish aggregate workflow findings to the team and avoid turning exploratory measurements into individual rankings. Once people believe a metric determines their standing, they have a reason to change what they submit and how they describe it. That undermines the experiment and the working relationship at the same time.
Spend the gains deliberately
If a workflow improves, management still has to choose what to do with the capacity. More features are one option. So are shorter recovery times, fewer deferred migrations, better accessibility and less maintenance toil.
At a small product studio, I would favor work that makes future changes easier to evaluate: realistic fixtures, fast local reproduction, explicit interface contracts and dependable rollback. Those investments can improve both human and agent work. They also remain useful when the preferred model changes.
There is a legitimate counterargument: measurement and infrastructure work can become a way to avoid using a promising technology. A team can spend a quarter designing an evaluation while its competitors learn by shipping. I would time-box the first evaluation, make a narrow reversible deployment, and compare actual outcomes. The evidence should be good enough for the next decision, with rigor proportional to the consequences.
My expectation for the next year
I expect more implementation work to run asynchronously, with engineers assigning bounded tasks and reviewing evidence after completion. In that setting, the ability to define a useful task and judge its result becomes a larger part of engineering work. It does not follow that every engineering organization needs fewer people: greater capacity may expose valuable work that was previously uneconomic.
I would change this view if broad, independently reproduced evidence showed sustained delivery gains without comparable investment in verification, coordination or operational discipline. For now, the strongest course is to use the tools extensively, measure completed work, and invest where the resulting queues tell you to invest.
The board-level commitment I would make is specific: we will identify which workflows improve, explain the cost of those improvements, and decide where the recovered capacity goes. That is a more useful promise than an unsupported multiplier.